A small closed pump impeller required enclosed flow passages and a controlled shaft interface. The confirmed manufacturing route used separate molded sections, ultrasonic welding, bore finishing after welding and balance correction.

The project reached production supply with 8,000 pieces reported delivered by September 30, 2026. The case concentrates on the manufacturing and component-inspection record rather than assigning an unsupported complete-pump performance rating.

PPS + 40% GF

Project material specification

6.002–6.008 mm

Measured finished bore

8,000 pieces

Reported cumulative delivery

Dark gray closed polymer pump impeller with six curved passages
Product design illustration · Not a project photograph.

Project background

Component, scope and current phase

Anonymized project scope · Record status as of 2026-09-30
ApplicationClosed impeller for a small water-pump assembly
MaterialCelanese Fortron 1140L4 PPS-GF40, as identified in project records
GeometryNominal 60 mm outside diameter, 25 mm height and six curved blades
Confirmed constructionBladed rear section and front cover molded separately, then ultrasonically welded
Finished bore requirementØ6 H7: 6.000–6.012 mm
Current phaseProduction supply; extended fluid-exposure evaluation still open

Engineering challenge

What the development work needed to resolve

Early development identified rotating imbalance, excessive shaft-interface clearance and blade-region issues. Enclosed passages also required an explicit manufacturing route rather than an assumption that the impeller was molded as one closed piece.

The bore needed to be evaluated after joining because the delivered geometry includes the weld operation. Component runout and balancing were kept separate from complete-pump vibration and hydraulic performance.

Separated rear blade body and front cover at concentric weld joint
Product design illustration of the component interfaces discussed in this case.

Manufacturing review

Changes and the verification approach

The rear plate and blades were molded as one section, with the front cover produced in a separate tool using the same specified material. Locating and joining surfaces were then used for ultrasonic assembly. This owner-confirmed sequence supersedes the earlier incomplete process description.

After welding, the shaft bore was reamed to the corrected H7 numerical limits. Balance correction followed in the defined finished configuration, avoiding a misleading claim based only on the geometry or mass distribution of a molded half.

The dimensional report and balance sample were recorded separately. The supplied balance summary indicates acceptance within the project G2.5 requirement at 1,000 rpm; this is not reported as a measured pump vibration amplitude.

  1. T0 · May 10

    50 pieces

  2. T1 · June 1

    200 pieces

  3. Production · July 10 onward

    8,000 cumulative pieces reported by September 30

Recorded observations

Results with their sample and test boundaries

Each result below applies to the stated specimens and configuration. Development, pilot and production checks are not combined into a single pass rate.

These are owner-supplied project summaries, not independently certified test reports.

Assembled polymer impeller on spindle between balancing supports, no values
Product design illustration of an inspection context, not evidence of a measured result.
Owner-supplied project results · Test scope kept separate from product ratings
CheckSamples and conditionsRecorded observationInterpretation boundary
Finished boreJuly 15 production lot; 20 sampled impellers, after welding and reaming6.002–6.008 mmWithin the stated Ø6 H7 limits of 6.000–6.012 mm
End-face runoutSame 20-specimen dimensional sample0.010–0.018 mmAgainst the project 0.02 mm limit
Balance evaluation50 sampled finished impellers; two-plane method at 1,000 rpmReported within the project G2.5 requirementSampled component balance, not complete-pump vibration or every-piece inspection
Outside diameter20 sampled impellers59.95–60.05 mmProject dimensional result

Release status

What is established and what remains open

Production supply was recorded, while a longer fluid-exposure program remained ongoing. No completed 500-hour hydrolysis qualification or universal service-temperature claim is made.

Pump flow and head are not promoted as product ratings here because the supplied summary does not establish the complete operating-point definition. Those conclusions belong to the identified pump assembly and its controlled test.

Published anonymously with the project owner's permission. Original test reports and project photographs were not supplied for this publication review. Images are product design illustrations; no customer or supplier identity is displayed.

Related guides

Plan the next component review

Review your component and its mating assembly

Send the drawings, operating conditions, quantities and acceptance methods to define tooling, molding and inspection.

Request A Quote

Tell Us About Your Project

Fields marked with are required.

Before uploading sensitive files, agree any NDA and permitted sharing with your FECISION contact and the selected manufacturing partner.

By submitting this form, you agree that Fecision may use the supplied information to respond to your inquiry.