LSR Diaphragm: Thickness and Sealing Pilot Validation

Project case study · October 14, 2026All Case Studies

A small silicone diaphragm for a pump and valve assembly needed controlled membrane thickness and a less abrupt transition into its supported region. Early development had shown local cracking during cycling and a wider thickness spread than desired.

The owner confirmed that the actual project material was DuPont Liveo Q7-7840. The case reports component-level development observations; the material identity is not presented as certification of the finished component or medical equipment.

16 cavities

LSR molding tool

0.48–0.52 mm

Sampled membrane thickness

2,000 pieces

Pilot batch

Translucent thin round silicone diaphragm with broad peripheral lip
Product design illustration · Not a project photograph.

Project background

Component, scope and current phase

Anonymized project scope · Record status as of 2026-10-06
ApplicationPump/valve diaphragm; customer equipment identity withheld
Actual materialDuPont Liveo Q7-7840 LSR; nominal 40 Shore A
Nominal geometry25 mm diameter, 0.5 mm active membrane and 1.5 mm intended stroke
ManufacturingSixteen-cavity LSR injection molding
Current phase2,000-piece pilot; endurance validation still running

Engineering challenge

What the development work needed to resolve

The initial record described a 0.45–0.55 mm membrane range and cracking near a transition during an earlier cycle trial. Thickness distribution, transition geometry and the assembled constraint therefore needed review together.

A successful short water-pressure check would answer only the sealing question at that condition. It could not close the separate endurance target or establish compatibility with every intended process fluid.

Sectioned diaphragm showing smooth radius from membrane to peripheral lip
Product design illustration of the component interfaces discussed in this case.

Manufacturing review

Changes and the verification approach

The development changes included a 0.3 mm transition radius and a gate-balance review. The case does not assign an unverified chemical explanation to process-temperature changes or calculate a life improvement from unmatched trial conditions.

Pilot membrane inspection covered 32 specimens, two from each of the 16 cavities, at five defined measurement locations. Keeping cavity and location information makes local variation visible instead of reducing the membrane to a single average thickness.

An assembled pump-head water-pressure check was recorded separately from hardness and fatigue testing. The ongoing cycle program retained its 500,000-cycle target as an open requirement rather than a completed result.

  1. T0 · June 25

    200 development pieces

  2. T1 · July 20

    500 pieces

  3. Pilot · September 15

    2,000 pieces

Recorded observations

Results with their sample and test boundaries

Each result below applies to the stated specimens and configuration. Development, pilot and production checks are not combined into a single pass rate.

These are owner-supplied project summaries, not independently certified test reports.

Diaphragm pump head connected to closed water test circuit with blank instruments
Product design illustration of an inspection context, not evidence of a measured result.
Owner-supplied project results · Test scope kept separate from product ratings
CheckSamples and conditionsRecorded observationInterpretation boundary
Membrane thicknessSeptember 18 pilot sample; 32 parts, 16 cavities × two; five measurement locations0.48–0.52 mmAgainst the project 0.50 ±0.03 mm requirement
Assembled water-pressure checkSeptember 20; 50 specimens in pump assembly; 0.2 MPa for 60 secondsNo leakage reported during the holdSpecific short-duration assembled test, not a general pressure rating
Hardness20 sampled specimens38–42 Shore AProject measurement summary
Fatigue checkpoint10 specimens; 1.5 mm stroke, 60 cycles/min200,000 cycles with no crack or leakage reported at the checkpointInterim result only; 500,000-cycle target remains open

Release status

What is established and what remains open

As of October 6, the pilot remained under validation. The dimensional and short sealing results do not establish completion of fatigue, biological evaluation or finished-system qualification.

The actual material grade is confirmed by the owner, while original material and test reports were not attached for independent review. No ISO 10993 or finished-device approval statement is added.

Published anonymously with the project owner's permission. Original test reports and project photographs were not supplied for this publication review. Images are product design illustrations; no customer or supplier identity is displayed.

Related guides

Plan the next component review

Review your component and its mating assembly

Send the drawings, operating conditions, quantities and acceptance methods to define tooling, molding and inspection.

Request A Quote

Tell Us About Your Project

Fields marked with are required.

Before uploading sensitive files, agree any NDA and permitted sharing with your FECISION contact and the selected manufacturing partner.

By submitting this form, you agree that Fecision may use the supplied information to respond to your inquiry.