A packaging sketch shows two single coax lines going into one dual housing. The centers on the mating header appear to agree with the proposed pitch. The arrangement looks settled until the assembly engineer asks which cable goes in first and where the release latch sits once the module is installed. At that point a second copy of the single-port drawing is of limited use.
A single shell can follow its own mating axis as an operator brings a flexible lead into position. A dual molding ties two axes to a common body. Moving the body to help the first port also moves the second port. That change in freedom matters both on the drawing and at the bench. Begin with the specific dual counterpart and its code, plus the equipment datums that locate it.
Product design illustrations.
Draw the full opening as the mate sees it
Plot the two axes on the mating face, the shared shroud perimeter and the latch location. Include each port's coding features where the selected design has them. Add a section along each insert axis so the toolmaker sees the entry lead and the final depth of overlap. A two-dimensional pitch and a front silhouette do not show whether one side bottoms before the other has reached engagement.
The Rosenberger FAKRA coding drawings show separate configurations for single and double housings. Follow the manufacturer's views applicable to the selected pair. The outer profile and key arrangement on the double version need their own review. Do not reconstruct a production mating envelope by scaling the coding illustrations or by joining the silhouettes of two single connectors.

Suppose both port axes on a dual FAKRA housing shift the same distance toward the latch. A center-to-center measurement will still pass. On a fixed header the first and second openings will both be displaced from the contacts. If only the second axis shifts, entry can start freely on one side and bind on the other. Marking the end of the row that binds is already more informative than recording “dual mate tight.”
Pick datums that survive installation
Determine which faces or bosses locate the housing when it is mated or mounted. Use those references to establish the position of the two axes and the position of the latch. Add the local bore sizes and entrance profiles so position error can be distinguished from a tight individual bore. A fixture that aligns exclusively on two self-centering pins can hide a common offset relative to the external shroud.
Look along the insertion direction as well. A warped front face or unequal stop depths can leave the two coax inserts at different axial positions even when their openings look aligned from the front. If insertion allows a controlled amount of motion, ask the interface owner for each insert's allowable window. Keep that information separate from the manufacturing tolerance on the empty molding.

Make space for both cables after the latch closes
Clamp the actual mating counterpart in its installed attitude and sketch the rear exit paths. Two bare cylinders might clear a bracket where a cable with a boot or crimp sleeve cannot. Check the assembled rear envelope through the intended loading, mating and release motions. Use the cable supplier's bend requirements for the specified construction and identify where assembly support begins.
Now look at access with one channel populated. A first cable can cover the finger path needed to push in the second insert or obstruct a secondary lock. Decide which insert is loaded first, how the second insertion can be seen or checked, and which lead is expected at each position. A cable label and a housing cavity identifier perform different jobs when adjacent leads look alike.

Build a check that tells you what was wrong
For tool trials, inspect the empty molding against a face-and-side locating scheme before trying it on the counterpart. Record which end of the row each measurement belongs to. Then check the populated configuration with both inserts present and the specified retention arrangement engaged. If the empty body is already tight, isolate the outer shroud and code features first. If difficulty appears after population, examine the insert axes and axial seating next.
A loose single-port master in each cavity can help track down where entry binds, but the two masters can tilt independently. Keep the rigid production counterpart for the final check. With the header fixed, the cable boots installed and both ports named on the inspection sheet, a failure at port B can be traced back to its own axis, to the shared shroud or to the route the second lead took around the first.

